Tank Barge Load Time Calculator

Pick your barges, set the rate the dock gave you, and see how long the load runs and when you'll be topped off.

Barges on the dock
Or a custom total
bbl

Type a total to override the presets. Clear it to go back.

Dock transfer rate 2,500 bph
Shift between barges
hrs

Dropping wires, shifting the tow, hooking the header back up.

Rule of thumb: a 10k loads in 4–6 hrs, a 30k in 6–8 hrs — if your math says different, check the rate the dock actually gave you.

2 × 30,000 bbl at 2,500 bph
0h 0m
hooked up to topped off
Total barrels
0
Effective rate
0 bph over the job
Per barge
0h 0m
Pumping time
0h 0m
Finish-time planner

Start your watch at 06:00, done at .

These are pumping estimates only — gauging, line displacement, stripping, paperwork and dock delays are not on this clock. The max transfer rate on your Declaration of Inspection governs, always.